1. The irrigation project authorities are not committed to maintaining
their canal infrastructure, as evidenced by a quick fi eld tour that
clearly indicates extensive deferred maintenance. This lack of maintenance is due to the lack of accountability and fi nancial transparency, lack of a maintenance plan, and other reasons.
2. Budgets are inadequate to sustain the automation project. This is
especially common in some projects in which donors fund theautomation and the government has no commitment to maintaining it. An annual maintenance budget of at least 15% of the cost of
PLC-based automation components is a good starting point.
3. There is a rush to design and install a large modernization project
within a few years, although the project staff does not have adequate experience with modernization concepts, much less with
modern SCADA and automation equipment.
4. The project staff is not qualifi ed to operate and maintain the equipment, and the project authorities are unwilling to spend enough
money to train the staff properly in advance for many months or
years.
5. There is a problem obtaining suffi cient electronic diagnostic equipment and spare parts before the modernization is implemented.
6. There are unreasonable expectations of massive water conservation
and easy operation.
7. There is a high turnover rate among irrigation project staff.
8. There is not a clear, advanced delineation of responsibilities among
the designers, builders, operators, SCADA, integrators (see Glossary), and others.
9. The irrigation project managers want to use inexpensive PLCs and
sensors, regardless of the requirements and capabilities.
10. There is not a clear understanding that there will inevitably be
setbacks with implementation.
11. The project managers want to invent, develop, or construct their
own sensors and actuators.
12. There are no qualifi ed local integrator companies or organizations
in the area.
13. There is no well-defi ned operational objective.
14. The people who ultimately operate and maintain the new system
are not brought into early and continued discussions as important
participants. Instead, all the planning and design meetings are
limited to designers and high-level irrigation project offi cials and
economists.
15. The designers have little or no experience with modern irrigation
system design.
16. Hardware manufacturers promote a system based on available
hardware. The common saying is then true: “When all you have is
a hammer, every problem looks like a nail.


النص الأصلي


  1. The irrigation project authorities are not committed to maintaining
    their canal infrastructure, as evidenced by a quick fi eld tour that
    clearly indicates extensive deferred maintenance. This lack of maintenance is due to the lack of accountability and fi nancial transparency, lack of a maintenance plan, and other reasons.

  2. Budgets are inadequate to sustain the automation project. This is
    especially common in some projects in which donors fund theautomation and the government has no commitment to maintaining it. An annual maintenance budget of at least 15% of the cost of
    PLC-based automation components is a good starting point.

  3. There is a rush to design and install a large modernization project
    within a few years, although the project staff does not have adequate experience with modernization concepts, much less with
    modern SCADA and automation equipment.

  4. The project staff is not qualifi ed to operate and maintain the equipment, and the project authorities are unwilling to spend enough
    money to train the staff properly in advance for many months or
    years.

  5. There is a problem obtaining suffi cient electronic diagnostic equipment and spare parts before the modernization is implemented.

  6. There are unreasonable expectations of massive water conservation
    and easy operation.

  7. There is a high turnover rate among irrigation project staff.

  8. There is not a clear, advanced delineation of responsibilities among
    the designers, builders, operators, SCADA, integrators (see Glossary), and others.

  9. The irrigation project managers want to use inexpensive PLCs and
    sensors, regardless of the requirements and capabilities.

  10. There is not a clear understanding that there will inevitably be
    setbacks with implementation.

  11. The project managers want to invent, develop, or construct their
    own sensors and actuators.

  12. There are no qualifi ed local integrator companies or organizations
    in the area.

  13. There is no well-defi ned operational objective.

  14. The people who ultimately operate and maintain the new system
    are not brought into early and continued discussions as important
    participants. Instead, all the planning and design meetings are
    limited to designers and high-level irrigation project offi cials and
    economists.

  15. The designers have little or no experience with modern irrigation
    system design.

  16. Hardware manufacturers promote a system based on available
    hardware. The common saying is then true: “When all you have is
    a hammer, every problem looks like a nail.


تلخيص النصوص العربية والإنجليزية أونلاين

تلخيص النصوص آلياً

تلخيص النصوص العربية والإنجليزية اليا باستخدام الخوارزميات الإحصائية وترتيب وأهمية الجمل في النص

تحميل التلخيص

يمكنك تحميل ناتج التلخيص بأكثر من صيغة متوفرة مثل PDF أو ملفات Word أو حتي نصوص عادية

رابط دائم

يمكنك مشاركة رابط التلخيص بسهولة حيث يحتفظ الموقع بالتلخيص لإمكانية الإطلاع عليه في أي وقت ومن أي جهاز ماعدا الملخصات الخاصة

مميزات أخري

نعمل علي العديد من الإضافات والمميزات لتسهيل عملية التلخيص وتحسينها


آخر التلخيصات

In India , a ve...

In India , a very popular brand name Amul. It is very good will brand and there is no substitute of ...

كان ياما كان في...

كان ياما كان في قديم الزّمان شابٌ اسمه علاء الدين، وكان هذا الشاب من عائلة فقيرة، وكان عمّ علاء الدي...

- نعم عدت لكنك ...

- نعم عدت لكنك مغمض العينين مظفر النواب ... الذي حقق الظفرين.. الحياة والموت ———- مظفر النواب ..ش...

إتمام المعاملات...

إتمام المعاملات في سرعة ملحوظة و جودة عالية. ٢- الإلمام بكيفية التعامل مع العملاء بطريقة حرفية و الت...

الشاف دلين يشرف...

الشاف دلين يشرف على سلسلة الإنتاج ويراقب كمية الانتاج ويحافظ على تنظيمها متل ل 5s كما يعمل على الجو...

نبدأ احداث قصتن...

نبدأ احداث قصتنا اليوم مع شاب كوري مثقف اسمه ( جي هون ) ، جي هون هو طالب يدرس في كلية الهندسة في احد...

String quartets...

String quartets are among the hardiest and most adaptable of musical organisms. As mobile as rock ba...

Design and simu...

Design and simulate a combinational circuit using the Quartus II simulator. 4-bit inputs From the sw...

أهمية التأثير ع...

أهمية التأثير على العقل الباطن يختصّ اللاوعي بإدارة الطاقات العاطفيّة، فهو يتحدّث لغة حسيّة من المشا...

كانت متطلبات ال...

كانت متطلبات الدین الإسلامي ذات ضرورة لرصد دائم لقبة السماء الزرقاء، لأن الرسول (ص) وضع قوانین ثابتة...

The resistance ...

The resistance to wear or hardness is one of the important properties of road aggregates. Road aggr...

يمتلك العقل الب...

يمتلك العقل الباطن قوّة كبيرة قادرة على تحقيق المعجزات، ويجب معرفة أنّه لا يمكنه أن يفرق بين التجربة...