Employment History May. 2023 - Till now o Position: Senior Resident Engineer o Khatib Alami (Consultant company) o Design and implementation project (Development of Al-Nsoor Roundabout by constructing tunnels and overpasses, constructing a bridge over the railway, and expanding adjacent roads) in Baghdad Governorate o The Contractor: Transtech Engineering Corporation (TEC), Chines Construction Company.o 22nd February Street /Omar Bin Al Khattab /Makkah Street o Underpass with two lanes each way and Parallel, one-way frontage roads o Al-Amir Street /Al Waab Road /Jawaan Street (Sudan) o three lanes each way underpass, each way, and parallel, one-way frontage roads o Al-Amir Street /Al Sadd Street Junction o two lanes each way underpass with, each way and Parallel, one-way frontage roads o Surface Water: Open Trench more than 25 km VCP and GRP pipes sizes from 200 mm to 2400 mm and micro-tunnelling more than 3 km. o Sewer lines: More than 9 km VCP size 150 mm to 900 mm VCP o Rising Mains: More than 3 km DI size 200 mm to 600 mm o TSE: More than 17 km HDPE pipes size 200 mm to 1000 mm o Potable water lines: More than 25 km DI size 100 mm to 1400 mm (only 1400mm more than 7500m) o Three surface water pump stations
May 2005 - May 2006 o Position: Resident Engineer o ASCO Consulting Engineers, QATAR (Consultant Company) o Project: Doha & Rayan Sewerage- Construction of Sewer lines and House connections / The Client: Ashghal- Drainage Affairs- Qatar Supervised, controlled, managed, and followed all the safety issues for two projects./ The Client: Ashghal- Roads Affair- Qatar The project consisted of the upgrade of 22nd February Street between Rayan Road and the recently constructed 22nd February Street /Al Shamal Road /Luqta Street /Khalifa Street (Immigration) Interchange to enable uninterrupted movement, which included: o 22nd February Street / Al Rayan Road (Jaidah Petrol) - grade-separated interchange of four levels comprising: o Three lanes, each way underpass, twin Bridge Decks with two lanes each way, Roundabout Bridges with three lanes, Viaduct with two lanes and Parallel, one-way frontage roads.o Al Aziziya Underground Storage Tank o Critical Asset Resilience Programme (CARP) o DN Project comprises design, supply, testing and completion of Surface Water Network., Storage Tank, Pumping Station, and emergency flooding areas as well remediation of defects of existing surface water network if found for the following areas: Al Kieesa, Oniza & Tarfa, Dafna & Bin Omran, Al Gharafa, and Kuaither & Al Rayyan o Al Azizizh Storage Tank project.Nov. 2002- August 2003 o Position: Assistant Resident Engineers, Coordination and Liaison Engineer o High Point Rendel Consulting Engineers, Doha, QATAR (Consultant Company) o Project: Salwa Interchange Project/ the Client: Roads Department- Qatar- Ministry of Municipality Supervised, controlled, negotiated, and managed the work.The project includes a 1.25km canal, 6.5km of asphalt roads, curbs, sidewalks, and car parking facilities.
Employment History
May. 2023 – Till now
• Position: Senior Resident Engineer
• Khatib Alami (Consultant company)
• Design and implementation project (Development of Al-Nsoor Roundabout by constructing tunnels and overpasses, constructing a bridge over the railway, and expanding adjacent roads) in Baghdad Governorate
• The Contractor: Transtech Engineering Corporation (TEC), Chines Construction Company.
• It is the biggest project in Iraq now. The contractor is Transtech Engineering Corporation. It contains Al Nsoor Bridge L. 890 m, Qahtan Bridge L. 487 m, Tunnel 1 L. 490 m, Tunnel 4 L. 553m & Tunnel 5 L. 1035 m passing under Tunnel 3 with modification on tunnels 2 & 3.
• Al Aziziya Underground Storage Tank
• Critical Asset Resilience Programme (CARP)
• DN Project comprises design, supply, testing and completion of Surface Water Network., Storage Tank, Pumping Station, and emergency flooding areas as well remediation of defects of existing surface water network if found for the following areas: Al Kieesa, Oniza & Tarfa, Dafna & Bin Omran, Al Gharafa, and Kuaither & Al Rayyan
• Al Azizizh Storage Tank project. Capacity is 28000 cubic meters.
• CARP in 8 areas.
July 2008 – Sep. 2019
• Position: Senior Construction Manager
• Energy City (Management Company)
• Energy City Libya & Qatar Entertainment City Projects
• Development of Road & Infrastructure at Energy City Qatar
• Managing Energy City Qatar's infrastructure works. It entails the construction of a 4.8-kilometer surface water drainage network. Pipe diameters ranging from 300mm to 1400mm, 4.1 km of foul sewer, 5.7 km of ductile iron water, district cooling, gas, and irrigation lines. The project includes a 1.25km canal, 6.5km of asphalt roads, curbs, sidewalks, and car parking facilities. Following the design for the works of the sub-developers and arranging the facilities for them to construct their buildings. Energy City Qatar is located on 78 ha in Lusail city.
• Following up on the work of the earthworks at the site, designs, and tenders for infrastructure work with the engineering consulting firms for Qatar Entertainment City. The area for Entertainment City is 100 ha. Also, I was following and reviewing the designs for drainage lines (surface water, sewer, and TSE), District cooling, water lines, gas lines, irrigation lines and LRT lines. Following the infrastructure design, the construction of the channel and the construction of access roads for Qatar Entertainment City. It is in Lusail City.
• The project is in Subratah in Libya. The total area is 780 ha. Managing the design of the master plan with WR Armstrong (an American company) and studying the market with DTZ (a British company).
May 2006 – July 2008
• Position: Resident Engineer- Drainage
• AECOM, Maunsell Consultancy Services Ltd., QATAR (Consultant Company)
• Project: 22nd February Street and Al-Amir Street Upgrade and Interchanges (Doha Expressway Package 1&2). / The Client: Ashghal- Roads Affair- Qatar
The project consisted of the upgrade of 22nd February Street between Rayan Road and the recently constructed 22nd February Street /Al Shamal Road /Luqta Street /Khalifa Street (Immigration) Interchange to enable uninterrupted movement, which included:
• 22nd February Street / Al Rayan Road (Jaidah Petrol) - grade-separated interchange of four levels comprising:
• Three lanes, each way underpass, twin Bridge Decks with two lanes each way, Roundabout Bridges with three lanes, Viaduct with two lanes and Parallel, one-way frontage roads.
• 22nd February Street /Omar Bin Al Khattab /Makkah Street
• Underpass with two lanes each way and Parallel, one-way frontage roads
• Al-Amir Street /Al Waab Road /Jawaan Street (Sudan)
• three lanes each way underpass, each way, and parallel, one-way frontage roads
• Al-Amir Street /Al Sadd Street Junction
• two lanes each way underpass with, each way and Parallel, one-way frontage roads
• Surface Water: Open Trench more than 25 km VCP and GRP pipes sizes from 200 mm to 2400 mm and micro-tunnelling more than 3 km.
• Sewer lines: More than 9 km VCP size 150 mm to 900 mm VCP
• Rising Mains: More than 3 km DI size 200 mm to 600 mm
• TSE: More than 17 km HDPE pipes size 200 mm to 1000 mm
• Potable water lines: More than 25 km DI size 100 mm to 1400 mm (only 1400mm more than 7500m)
• Three surface water pump stations
May 2005 – May 2006
• Position: Resident Engineer
• ASCO Consulting Engineers, QATAR (Consultant Company)
• Project: Doha & Rayan Sewerage- Construction of Sewer lines and House connections / The Client: Ashghal- Drainage Affairs- Qatar
Supervised, controlled, managed, and followed all the safety issues for two projects. Projects are the construction of chambers, sewerage networks, and connections from main sewers or lines to the properties and plots.
Aug. 2003- May 2005
• Position: Assistant Resident Engineer
• ASCO Consulting Engineers, QATAR (Consultant Company)
• Project: Al Dhakhira Area Sewerage Project/ Client: Ashghal- Drainage Affairs- Qatar
This project was a sewerage network, construction of connections from the main sewer to the properties and plots, construction of a trunk sewer and three numbers of pumping stations. Around 7 km TSE from the PS to the Sewage Plant. I supervised, controlled, negotiated, managed, and followed all the safety on the site.
Nov. 2002- August 2003
• Position: Assistant Resident Engineers, Coordination and Liaison Engineer
• High Point Rendel Consulting Engineers, Doha, QATAR (Consultant Company)
• Project: Salwa Interchange Project/ the Client: Roads Department- Qatar- Ministry of Municipality
Supervised, controlled, negotiated, and managed the work. The project consisted of a 1480 m underpass with 30 m internal width with walls up to 10.4 m high, a 202 m twin bridge superstructure and a single bridge with a 15 m span and 35 m width. Storm Water, Foul Sewerage and TSE lines.
April 2002 –November 2002
• Position: Assistant Resident Engineer
• Wednell Dubai, UAE (Consultant Company)
• Project: Al Muroog Complex Center
Reviewed the design drawings for Civil and Architectural and found the differences before commencing the works on site. The project consists of three buildings with ten stories of accommodation, one building a seventeen-story hotel with two two-story garage building, parking area and gardens (Two buildings are ten stories).
تلخيص النصوص العربية والإنجليزية اليا باستخدام الخوارزميات الإحصائية وترتيب وأهمية الجمل في النص
يمكنك تحميل ناتج التلخيص بأكثر من صيغة متوفرة مثل PDF أو ملفات Word أو حتي نصوص عادية
يمكنك مشاركة رابط التلخيص بسهولة حيث يحتفظ الموقع بالتلخيص لإمكانية الإطلاع عليه في أي وقت ومن أي جهاز ماعدا الملخصات الخاصة
نعمل علي العديد من الإضافات والمميزات لتسهيل عملية التلخيص وتحسينها
سنقوم في هذا العنصر بالتطرق إلى أهم أبعاد جودة الخدمة ومستوياتها. أولا: أبعاد جودة الخدمات لقد تعر...
حسن حازب وزير التعليم العالي السابق في حكومة مليشيا الحوثي أطلق حسين علي حازب، الوزير السابق في حكوم...
attack notions of reason and means-end thinking. The line "I feel; therefore, I am and what I feel ...
بعد استعراض استراتيجيات تشجيع السياحة البيئية في فلسطين ونماذج عالمية و الخطط المستقبلية يصبح من ال...
as a guide in villages or open areas outside cities.To sum up, dogs are the right choice to adopt.So...
دور المعلم في تنمية التفكير لدى الطلبة 1 - أن يكون المعلمون أفراداً يتمتعون بالجدارة والثقة ٢ - أن...
التكوين التاريخي للصين منذ القرن السادس الميلادي توحدت الصين في إمبراطورية واحدة ، وتتابعت على حكم ...
المراد بتحكيم شرع الله تعالى أن يجعل شرع الله حكماً في شوؤن الحياة كلها التحليل والتحريم حق الله تعا...
_برنامج عالجي معرفي سلوكي: هو كل التقنيات املعرفية والسلوكية التي تم تنظيمهاوترتيبها وفق خطة مضبوطة ...
تواصل الدولة التونسية تأمين رحلات العودة الطوعية للأفارقة جنوب الصحراء المتواجدين في بلادنا بصفة غير...
المحافظة على المحيطات ضرورية وحيوية لكوكبنا وللبشرية جمعاء. المحيطات تغطي أكثر من 70% من سطح الأرض و...
Functionally Graded Materials (FGMs) exhibit a continuous variation of material properties due to t...