Table of Contents
Foreword
A. Decreased performance of railway junction Stuttgart
p.1
A1: Promised service unachievable p.1 A2: Performance dismantling p.3 A3: Decommissioning the existing trackage still unsettled p.3 A4.Lack of timetable robustness in case of disruptions p.3 A4.1: When the tunnels are closed, not all tracks can be used p.3 A4.2: No alternative for S-Bahn trains p.3
B. Reduced safety
B1: Sixfold canted track gradient p.3 B2: Inadequate fire protection p.3
B3: Limitations and lack of escape routes for disabled people B4: Narrow platforms and accesses
C. Building risks
C1: Risk of swelling anhydrite / building damage due to uplift C2: Unsafe underground / risk of floating
C3: Danger of sinkholes and landslides
C4: Risk of ground water and mineral water
D. Incalculable cost risks
D1: Multiplied construction costs / cost obfuscation D2: Operating profitability of Stuttgart21 unachievable D3: Breach of efficiency principle and Group Policy D4: Delay costs
p.4 p.4
p.5 p.5 p.5 p.5
p.6 p.6 p.6 p.6
E. Unresolved airport and S-Bahn train connections / traffic problems with
public transport
E1: Mixed traffic and one-track route Filderstadt
E2: Ministerial permission to use S-Bahn tunnel for passenger trains
E3: S-Bahn and city railway operating through S-21 impaired over the years E4: Problems during trial operation and commissioning
F. Contractual and implementation issues
F1: Construction time overruns - completion delayed by years F2: Plan approvals are not completed
G. Environment and climate threatened by S-21
G1: Increased energy expenditure and significant CO2 release with S-21 G2: Inner city recreation areas destroyed by S-21
G3: Increased risk of inner city flooding by S-21
A. Decreased performance of the railway junction Stuttgart
A1: Promised service unachievable
p.7 p.7 p.7 p.7
p.7 p.7
p.8 p.8 p.8
o Statement of the Deutsche Bahn (DB) 1996: double the performance of S21 relative to the terminus stati- on
o Arbitration 2010: 50% increase in performance was promised.o Today we know: 40% performance reduction (!) compared to the terminus station, no reserves for the S-Bahn, in peak hours chaos is inevitable.This statement was even included in the application for funding by the European Commission and was the official announce- ment at the time of the loan contract (2009), mediation (2010), and the referendum (2011).In 2013, these untenable promises were implicitly withdrawn.o The project Stuttgart 21 was advertised for many years with double performance.


النص الأصلي

Table of Contents
Foreword
A. Decreased performance of railway junction Stuttgart
p.1
A1: Promised service unachievable p.1 A2: Performance dismantling p.3 A3: Decommissioning the existing trackage still unsettled p.3 A4. Lack of timetable robustness in case of disruptions p.3 A4.1: When the tunnels are closed, not all tracks can be used p.3 A4.2: No alternative for S­Bahn trains p.3
B. Reduced safety
B1: Sixfold canted track gradient p.3 B2: Inadequate fire protection p.3
B3: Limitations and lack of escape routes for disabled people B4: Narrow platforms and accesses
C. Building risks
C1: Risk of swelling anhydrite / building damage due to uplift C2: Unsafe underground / risk of floating
C3: Danger of sinkholes and landslides
C4: Risk of ground water and mineral water
D. Incalculable cost risks
D1: Multiplied construction costs / cost obfuscation D2: Operating profitability of Stuttgart21 unachievable D3: Breach of efficiency principle and Group Policy D4: Delay costs
p.4 p.4
p.5 p.5 p.5 p.5
p.6 p.6 p.6 p.6
E. Unresolved airport and S­Bahn train connections / traffic problems with
public transport
E1: Mixed traffic and one­track route Filderstadt
E2: Ministerial permission to use S­Bahn tunnel for passenger trains
E3: S­Bahn and city railway operating through S­21 impaired over the years E4: Problems during trial operation and commissioning
F. Contractual and implementation issues
F1: Construction time overruns ­ completion delayed by years F2: Plan approvals are not completed
G. Environment and climate threatened by S­21
G1: Increased energy expenditure and significant CO2 release with S­21 G2: Inner city recreation areas destroyed by S­21
G3: Increased risk of inner city flooding by S­21
A. Decreased performance of the railway junction Stuttgart
A1: Promised service unachievable
p.7 p.7 p.7 p.7
p.7 p.7
p.8 p.8 p.8
• Statement of the Deutsche Bahn (DB) 1996: double the performance of S21 relative to the terminus stati­ on
• Arbitration 2010: 50% increase in performance was promised.
• Today we know: 40% performance reduction (!) compared to the terminus station, no reserves for the S­Bahn, in peak hours chaos is inevitable.
• The project Stuttgart 21 was advertised for many years with double performance. This statement was even included in the application for funding by the European Commission and was the official announce­ ment at the time of the loan contract (2009), mediation (2010), and the referendum (2011). In 2013, these untenable promises were implicitly withdrawn.


تلخيص النصوص العربية والإنجليزية أونلاين

تلخيص النصوص آلياً

تلخيص النصوص العربية والإنجليزية اليا باستخدام الخوارزميات الإحصائية وترتيب وأهمية الجمل في النص

تحميل التلخيص

يمكنك تحميل ناتج التلخيص بأكثر من صيغة متوفرة مثل PDF أو ملفات Word أو حتي نصوص عادية

رابط دائم

يمكنك مشاركة رابط التلخيص بسهولة حيث يحتفظ الموقع بالتلخيص لإمكانية الإطلاع عليه في أي وقت ومن أي جهاز ماعدا الملخصات الخاصة

مميزات أخري

نعمل علي العديد من الإضافات والمميزات لتسهيل عملية التلخيص وتحسينها


آخر التلخيصات

الموضوعات دعوى...

الموضوعات دعوى - شروط قبول الدعوى - فوات مدد التظلم - تكرار التظلم الوجوبي - التظلم المعتبر في احت...

ثانياً جمع عثما...

ثانياً جمع عثمان القرآن، وكتابة المصاحف، وإرسالها إلى الأمصار: ثبت أن القرآن نزل على سبعة أحرف، كما...

جمع القرآن : • ...

جمع القرآن : • سبق أن تكلمنا عن جمع القرآن في عهد رسول الله صلى الله عليه وسلم ، وقد جمع القرآن في ...

5 .أنواع نمو ال...

5 .أنواع نمو المؤسسة: يمكن تصنيف أنواع نمو المؤسسة إلى ما يلي: النمو الداخلي: بعد النقاشات التي أث...

Technological a...

Technological advancement is the improvement and innovation of the utility of science. Science is an...

أَنا وَجْهي غَي...

أَنا وَجْهي غَيْرُ كُلِّ الوُجوهِ، قَلْبي، دَبيبُ الدَّمِ في عُروقي، هَكذا أَشْعُرُ، وَأَنا أَقِفُ ع...

عض المشكلات الص...

عض المشكلات الصحیة أولًا: التدخین Smoking: التدخینھوإستعمالالتبغالذيھونباتمنالفصیلةالباذنجانیة، و...

At the Airport ...

At the Airport Before the Flight: When I arrived at the airport, I headed straight to the check-in ...

وتخدم أيضا برمج...

وتخدم أيضا برمجية جيوجبرا التعلم في الإحصاء إذ يلعب الاحصاء دوراً كبيرا ومهما ومتزايداً في كل مظاهر ...

أولا: علم السيا...

أولا: علم السياسة كحقل من حقول المعرفة: ان المعرفة العلمية لاي حقل من حقول المعرفة تتطلب في البداية ...

خلق الله النوم ...

خلق الله النوم رحمة بالإنسان يخلد إليه فيزيل عنه النصب ويرفع ما به من وصب فينصف المرء جسده وفكره وعق...

هل فكر الإنسان ...

هل فكر الإنسان يومًا في الضرر الذي يسببه؟ هناك أشياء كثيرة يريدها الناس، لكنهم يفعلونها ولا يفكرون ف...