To determine whether the road construction project is expected to be completed on budget, under budget, or over budget, we can use Cost Variance (CV) and Cost Performance Index (CPI).[ CPI = \frac{EV}{AC} ]

Step 1: Calculate the Cost Performance Index (CPI)

[ CPI = \frac{4,500,000}{9,000,000} = 0.5 ]

A CPI of 0.5 indicates that for every dirham spent, the project is only earning 0.5 dirhams of value.[ AC = 9,000,000 \text{ AED} ]

Step 3: Calculate the Cost Variance (CV)

[ CV = EV - AC = 4,500,000 - 9,000,000 = -4,500,000 \text{ AED} ]

A negative CV means the project is over budget by AED 4,500,000.So, the Earned Value (EV) for the project after 10 weeks is:

[ EV = 30% \times 15,000,000 = 4,500,000 \text{ AED} ]

Step 2: Calculate the Actual Cost (AC)

The actual cost spent after 10 weeks is AED 9,000,000, as provided in the scenario.Cost Performance Index (CPI) CPI is a ratio that indicates the cost efficiency of the project.Cost Variance (CV) Cost Variance is a measure of the difference between the Earned Value (EV) and the Actual Cost (AC).### Conclusion:

  • The Cost Variance (CV) is negative (AED -4,500,000), meaning the project is over budget.### 1.### 2.


النص الأصلي

To determine whether the road construction project is expected to be completed on budget, under budget, or over budget, we can use Cost Variance (CV) and Cost Performance Index (CPI). These two metrics are part of the Earned Value Management (EVM) approach, which helps evaluate a project's financial performance.


1. Cost Variance (CV)


Cost Variance is a measure of the difference between the Earned Value (EV) and the Actual Cost (AC). It helps determine if the project is under or over budget.


[
CV = EV - AC
]


Where:




  • EV (Earned Value): The value of the work actually completed by a specific time.


  • AC (Actual Cost): The actual cost incurred to perform the work by that specific time.


Step 1: Calculate the Earned Value (EV)


We know that the total project cost is AED 15,000,000, and the project was planned to complete 10% of the work each week. After 10 weeks, 30% of the work has been completed. So, the Earned Value (EV) for the project after 10 weeks is:


[
EV = 30% \times 15,000,000 = 4,500,000 \text{ AED}
]


Step 2: Calculate the Actual Cost (AC)


The actual cost spent after 10 weeks is AED 9,000,000, as provided in the scenario.


[
AC = 9,000,000 \text{ AED}
]


Step 3: Calculate the Cost Variance (CV)


[
CV = EV - AC = 4,500,000 - 9,000,000 = -4,500,000 \text{ AED}
]


A negative CV means the project is over budget by AED 4,500,000.


2. Cost Performance Index (CPI)


CPI is a ratio that indicates the cost efficiency of the project. It shows how well the project is performing relative to its budget. A CPI greater than 1 indicates the project is under budget, while a CPI less than 1 indicates the project is over budget.


[
CPI = \frac{EV}{AC}
]


Step 1: Calculate the Cost Performance Index (CPI)


[
CPI = \frac{4,500,000}{9,000,000} = 0.5
]


A CPI of 0.5 indicates that for every dirham spent, the project is only earning 0.5 dirhams of value. This is a sign that the project is significantly over budget.


Conclusion:



  • The Cost Variance (CV) is negative (AED -4,500,000), meaning the project is over budget.

  • The Cost Performance Index (CPI) is 0.5, indicating that the project is not cost-efficient and is likely to end up over budget.


So, the road construction project is expected to be over budget.


تلخيص النصوص العربية والإنجليزية أونلاين

تلخيص النصوص آلياً

تلخيص النصوص العربية والإنجليزية اليا باستخدام الخوارزميات الإحصائية وترتيب وأهمية الجمل في النص

تحميل التلخيص

يمكنك تحميل ناتج التلخيص بأكثر من صيغة متوفرة مثل PDF أو ملفات Word أو حتي نصوص عادية

رابط دائم

يمكنك مشاركة رابط التلخيص بسهولة حيث يحتفظ الموقع بالتلخيص لإمكانية الإطلاع عليه في أي وقت ومن أي جهاز ماعدا الملخصات الخاصة

مميزات أخري

نعمل علي العديد من الإضافات والمميزات لتسهيل عملية التلخيص وتحسينها


آخر التلخيصات

يتميز البحث الع...

يتميز البحث العلمي بوجود مشكلة يتصدى لها الباحث بالدراسة على أسس موضوعية من أهمها أن تكون المشكلة جد...

تباع الأوصاف ال...

تباع الأوصاف الثلاثة المتقدمة بهذا ليس لمجرد سرد صفات من صفاته تعالى ، بل هو مما أثارته الأوصاف المت...

En route pour l...

En route pour l'Australie 🇦🇺 (peut-être un autre tronçon vers l'Indonésie 🇮🇩) nouveau chapitre, nouv...

المحاضرة الأولى...

المحاضرة الأولى: مفهوم التسويق الاستراتيجي [cite: 1] مفهوم التسويق الاستراتيجي يعرف التسويق الاسترا...

لقد تراكمت عدة ...

لقد تراكمت عدة عوامل ادت الى ضعف الدولة العثمانية كان اهمها توغل الاستعمار الاوروبي بالمشرق العربي ...

التعليم في «الخ...

التعليم في «الخمسين».. قفزات استثنائية (٣) مع إعلان الشيخ خليفة بن زايد آل نهيان، رحمه الله، عام 202...

2218 / 10000 39...

2218 / 10000 399كنت تواجه تحدياً كبيراً في خدمة التعليم الصفي المتنقل في مرحلة رياض الأطفال حيث أن م...

أواال: حروب الم...

أواال: حروب المستعمرات الشمالية: ناشد الكونجرس كندا مرة أخرى للوقوف معهم ضد بريطانيا لكنهم رفضوا. و ...

في دراسة حديثة ...

في دراسة حديثة أجراها Nagaraju وVijaya (2022)، تم اقتراح نموذج فعال للتنبؤ بفقدان العملاء في قطاع ال...

الذكاء الاصطناع...

الذكاء الاصطناعي والمطورون يستخدم المطورون الذكاء الاصطناعي لأداء المهام التي يتم تنفيذها يدويًا بكف...

الفصل الأول حفر...

الفصل الأول حفر قناة السويس ونشأة مدينتي بورسعيد والإسماعيلية  : المنطقة التي نشأت فيها بورسعيد : ت...

إن التطور السري...

إن التطور السريع و الاستعمال الواسع لعدد كبير من الوسائل اللاسلكية في منطقة محدودة ذات الاتجاهات الم...